Learn · Materials and carbon
How to read a material’s carbon.
The carbon figure for a building product comes from a document called an EPDEnvironmental Product Declaration: a report of a product’s environmental impact over its life, calculated to a published standard (EN 15804 for construction products) and checked independently., and is measured in kgCO₂eKilograms of carbon dioxide equivalent: all the greenhouse gases a product causes, expressed as the amount of CO₂ that would have the same warming effect.. Learn to read one and you can read them all. As you scroll, two real products go through their whole lives, using the figures from their own EPDs.
- 01What an EPD isThe document behind every figure, and what to look at first.
- 02A brick’s lifeFrom clay pit to second life, stage by stage.
- 03Why timber is differentHow timber stores carbon, and when it gives it back.
- 04Assumptions and gapsWhich figures are assumptions, and why “not declared” is not zero.
- 05Why bars don’t compareA tonne of brick is not a cubic metre of timber.
- 06From material to wallEvery layer of a wall is a product, and the design decides how much of each.
- 07Two walls, one jobWhy you can’t compare one product with another, and what you can compare.
01
What an EPD is
An Environmental Product Declaration (EPD) measures the environmental impact of a product over its life. It can cover one product, a family of products or a whole industry. It is calculated to a published standard and checked independently before it is published. It reports the impact; it does not say whether it is good or bad. Here is a real one, built up one part at a time.
1 · Who checked it
A number you can look up
Every EPD is registered with an organisation that publishes EPDs, called a programme operator, such as EPD International, EPD Hub or BRE, and given a number. With that number, anyone can find the original document and see who checked it.
2 · The rules
Calculated to a standard
For construction products the standard is EN 15804. Its current version, EN 15804+A2 (2019), splits carbon into three parts: fossil, biogenic carbonCarbon that plants took out of the air as they grew and that is held in the material. EN 15804+A2 shows it as a negative number when the product is made. and land use. That split is what lets a timber EPD show the carbon the wood holds.
3 · What it is per
Read the unit first
Every figure is for a set amount of product, called the declared unitThe amount of product every figure in a declaration refers to, such as one tonne, one square metre or one cubic metre.: a kilogram, a square metre or a cubic metre, for example. Check it before reading any number, because it changes what the number means.
4 · How long it is good for
EPDs expire
Most EPDs are valid for five years. An expired one is still useful, but the product or the factory may have changed since it was written.
5 · The results
The numbers become the bars
Further down is the results table: one column for each stage of the product’s life, and one row for each kind of impact. For carbon, read the row called GWPGlobal warming potential: the climate-change figure in an EPD, in kgCO₂e. Under EN 15804+A2, “GWP-total” is fossil, biogenic and land-use carbon added together..
Every bar on this site is drawn from that row, and nothing else.
02
A brick’s life
An EPD splits a product’s life into stages, in the order they happen. A1 to A3 is making it. A4 and A5 are getting it to site and building it in. B is its working life, and C is its end of life. D covers what might happen after that: it sits outside the system boundaryThe edge of what an EPD counts: from raw materials (A1) to disposal (C4). Module D sits outside it. of the assessment and is never added to the rest. Follow one real brick through every stage.
Making it
A1
It starts in a clay pit. Digging and preparing the clay: +37.7 kgCO₂e.
A2
Then the journey to the factory: +0.577 kgCO₂e.
A3
Then the factory itself. The clay is shaped, dried and fired in a kiln, which needs a lot of heat: +244 kgCO₂e.
A1–A3
Together, the product stage comes to +282 kgCO₂e per tonne of clay bricks.
Most of it comes from the factory, before the product goes anywhere near a site.
Key idea
For this product, most of the carbon is emitted before it reaches site, so it is set by the choice of product.
To site
A4–A5*
Delivering it to site: +12.5 kgCO₂e. Building it in, including waste on site: +16.9 kgCO₂e.
Both are based on assumptions in the EPD, called scenarioAn assumption an EPD makes for a stage it cannot know, such as the distance to site. Your project’s real figure will be different.: a typical journey and a typical amount of waste. Your project’s figures will be different.
In use
B
This EPD does not include the use stage, so there is nothing to show.
Key idea
Missing does not mean zero. Maintenance and replacement depend on the building, not the product, so many EPDs leave them out.
End of life
C1–C4
Demolishing it, taking it away, processing it and disposing of it: +16 kgCO₂e.
Where it goes next changes what is counted. If it goes to landfill, that is the end, and everything is counted in C. If it is reused or recycled, the work of preparing it is still counted in C, but any benefit or cost to whatever it becomes next is counted separately, beyond the system boundaryThe edge of what an EPD counts: from raw materials (A1) to disposal (C4). Module D sits outside it., in D.
This EPD’s route
C1–C4 cover demolition, crushing and disposal, with module D crediting recovery as secondary aggregate. In plain terms, this EPD assumes some of it is crushed for use as aggregate and some is sent to landfill. Module D counts the benefit of that aggregate replacing newly quarried material. In the drawing, the routes this EPD assumes are solid lines.
A second life
D
The EPD puts the benefit of reusing, recovering or recycling it at -3.75 kgCO₂e: carbon that might be avoided later, when it replaces new material.
This is module DPossible benefits or costs after the product’s life, from reuse, recovery or recycling. Reported separately and never added to stages A to C.. It is reported separately and never added to the other stages. Only material that is reused, recycled or recovered counts here.
For designers
What happens at the end is decided at the design stage. Bricks laid in soft lime mortar can be cleaned and reused; bricks laid in hard cement mortar rarely can, and are usually crushed. This EPD does not assume the product is reused.
In short
A–D
Of the stages this EPD declares, making the product is the largest.
Ibstock Atlas Smooth Blue · kgCO₂e per tonne of clay bricks (declared per 1 kg; figures ×1000)
- A1 raw materials+37.7
- A2 to the factory+0.577
- A3 manufacture+244
- A4 to site*+12.5
- A5 installation*+16.9
- B usenot declared—
- C end of life+16
- D beyond-3.75
03
Why timber is different
Timber contains something a brick does not: carbon that the tree took out of the air. EN 15804+A2 counts it when it goes into the wood, and counts it again when it comes out. What timber offers is time: the carbon stays out of the air for as long as the wood lasts. Follow a cross-laminated timber (CLT) panel and watch where the green goes.
Making it
A1–A3
A tree takes carbon dioxide out of the air as it grows, and some of that carbon stays in the wood.
The EPD records this as biogenic carbonCarbon that plants took out of the air as they grew and that is held in the material. EN 15804+A2 shows it as a negative number when the product is made.: -762 kgCO₂e. It is negative because it has been taken out of the air.
A1–A3
Felling, transporting, sawing, drying and pressing the panels all use energy. The EPD puts the resulting fossil emissionsGreenhouse gases from burning fossil fuels and from chemical processes: running a kiln, a dryer, machinery or lorries. at +74.8 kgCO₂e.
A1–A3
So KLH® CLT leaves the factory at -686 kgCO₂e per m³: it holds more carbon than was released in making it.
Key idea
A negative figure here means carbon stored, not carbon saved. It stays out of the air only as long as the timber lasts.
To site
A4–A5*
Delivering it to site: +63.5 kgCO₂e. Building it in, including waste on site: +10.9 kgCO₂e.
Both are based on assumptions in the EPD, called scenarioAn assumption an EPD makes for a stage it cannot know, such as the distance to site. Your project’s real figure will be different.: a typical journey and a typical amount of waste. Your project’s figures will be different.
In use
B
This EPD does not include the use stage, so there is nothing to show.
Key idea
Missing does not mean zero. Maintenance and replacement depend on the building, not the product, so many EPDs leave them out.
End of life
C1–C4
Demolishing it, taking it away, processing it and disposing of it: +795 kgCO₂e.
This is where the carbon stored in the wood is counted back out, as EN 15804+A2 requires. Across stages A to C the stored carbon cancels out. What is left is mostly the fossil carbon from making, moving and disposing of the timber.
Where it goes next changes what is counted. If it goes to landfill, that is the end, and everything is counted in C. If it is reused, recycled or burned for energy, the work of preparing it is still counted in C, but any benefit or cost to whatever it becomes next is counted separately, beyond the system boundaryThe edge of what an EPD counts: from raw materials (A1) to disposal (C4). Module D sits outside it., in D.
This EPD’s route
The EPD sets out its assumed route in its end-of-life scenario. The drawing shows the possible routes, not the one it chose.
A second life
D
The EPD puts the benefit of reusing, recovering or recycling it at -262 kgCO₂e: carbon that might be avoided later, when it replaces new material.
This is module DPossible benefits or costs after the product’s life, from reuse, recovery or recycling. Reported separately and never added to stages A to C.. It is reported separately and never added to the other stages. Only material that is reused, recycled or recovered counts here.
For designers
What happens at the end is decided at the design stage. Panels fixed with screws or bolts can be taken apart and reused; panels that are glued or nailed rarely can.
In short
A–D
It stores more carbon than is emitted in making it, but the stored carbon is released again at the end of its life.
KLH® CLT · kgCO₂e per m³ (density 470 kg/m³)
- A1–A3 stored-762
- A1–A3 making+74.8
- = A1–A3 total-686
- A4 to site*+63.5
- A5 installation*+10.9
- B usenot declared—
- C end of life+795
- D beyond-262
04
Assumptions and gaps
Before trusting any EPD, you need to know two things: which of its figures are assumptions, and which are missing.
A4–A5*
Some stages are assumptions
An EPD cannot know where your site is. So for delivery and installation it assumes a typical journey, a type of lorry and an amount of site waste. These assumptions are called scenarioAn assumption an EPD makes for a stage it cannot know, such as the distance to site. Your project’s real figure will be different., and every EPD lists them so you can see what was assumed. The end of life and module D are also based on scenarios.
On this site, delivery and installation are drawn as grey bars with an asterisk.
A4*
Your journey will differ
If your site is further away, delivery produces more carbon than the EPD says; if it is nearer, less. For a project assessment, use your own distances and waste figures.
B
“Not declared” is not zero
Under EN 15804+A2, most products must report stages A1–A3, C1–C4 and D. The use stage (B) is often left out, because maintenance and replacement depend on the building rather than the product.
If a stage is missing, the EPD simply does not report it. Treat it as a gap in the information, never as zero. That is why this site shows it as an empty, dashed space rather than a bar.
05
Why bars don’t compare
Ibstock Atlas Smooth Blue
kgCO₂e per tonne of clay bricks
KLH® CLT
kgCO₂e per m³
Which one is lower?
It is tempting to put two charts side by side and pick the shorter bar. Here are the two products you have just followed.
Check what each figure is for
The brick’s figures are for one tonne. The timber’s are for one cubic metre. These are not equal amounts of anything, so the bars cannot be compared. That is why each chart on this site has its own scale.
Ask a fairer question
Compare things that do the same job, such as a square metre of wall that performs the same. For that you need the quantities (how much of each product the wall uses), the same stages, and your own transport distances.
EN 15804 itself says EPDs can only be compared in the context of a whole building. Doing that is the job of a whole-life carbon assessment. This site gives you the evidence for one; it does not rank products.
Ibstock Atlas Smooth Blue
kgCO₂e per tonne of clay bricks
KLH® CLT
kgCO₂e per m³
The fair question
Brick wall
how much does your design use?
Timber wall
how much does your design use?
The same job, your quantities, the same stages, your transport distances.
06
From material to wall
EPDs are written for single products, but buildings are made of assemblies, and the order of the layers is part of the design. Here is a cavity wall, built layer by layer.
1Strip foundation · EPD unit: m³ or tonne
Step 1 of 7
Foundation
A concrete strip footing spreads the weight of both leaves of the wall into firm ground, below the depth that frost reaches.
Step 2 of 7
Below ground
Masonry rises off the footing. Below ground the cavity is filled with lean-mix concrete so the soil cannot push the two leaves together. But the fill bridges the cavity, so water has to be stopped above it.
Step 3 of 7
The floor
Hardcore, a damp-proof membrane, insulation and the slab. The finished floor sits level with the damp-proof course.
Step 4 of 7
DPC and cavity tray
A damp-proof course in each leaf, at least 150 mm above the ground, stops damp rising. Over the filled cavity, a tray slopes down and out to catch water that gets into the cavity.
Step 5 of 7
Inner leaf and ties
The inner leaf of blockwork carries the floors and roof. Stainless steel ties cross the cavity to hold the two leaves together, with a drip in the middle so water cannot run across.
Step 6 of 7
Insulation and outer leaf
Insulation goes against the inner leaf, leaving a clear cavity behind the brick. The facing brick keeps the weather out, but it is never completely watertight.
Step 7 of 7
Weep holes
Any water that gets through runs down the back of the brick, onto the tray, and out through open joints left just above it, called weep holes. Without them, the tray would hold the water instead of draining it. Plasterboard finishes the inside.
And so
Every layer is a product
This one small detail contains thirteen products, numbered on the drawing. Each can have its own EPD, and each EPD uses its own unit.
To work out the carbon of one, measure its quantity from the drawing, then convert that into the unit its EPD uses. The design decides how much of each product is used, which is why carbon only means something when it is counted for the whole wall, and the whole building.
One layer, counted
Count the bricks
Take the facing brick. A square metre of wall one brick thick contains about 59 bricks. This brick’s EPD is per tonne, so the bricks must first be converted into tonnes, which needs the weight of one brick.
Only then can the EPD figure be applied. It gives the carbon of making the bricks alone; every other product in the wall is counted in the same way.
- 1Strip foundationm³ of concrete per metre of wallm³ or tonne
- 2Engineering brickm² of leaf below the DPCtonne, kg or 1,000 bricks
- 3Cavity fillm³ per metre of wallm³ or tonne
- 4Hardcoretonnes, or m³ compactedtonne
- 5Floor insulationm² at its thicknessm² at a stated thickness, or m³
- 6Slabm³ of concretem³ or tonne
- 7DPClength in metres, and widthm² or kg
- 8Cavity traylength in metresm² or kg
- 9Block inner leafm² of wallm³, tonne or m²
- 10Wall tiesabout 2.5 per m² at 900 × 450 mm spacingkg or tonne of steel
- 11Cavity insulationm² at its thicknessm² at a stated thickness, or m³
- 12Facing brickabout 59 bricks per m²tonne, kg or 1,000 bricks
- 13Plasterboardm² of wallm²
A generic build-up drawn to approximate scale. Not a construction detail for any project.
07
Two walls, one job
When people compare materials, they are really asking about walls. Here are two ways of building an external wall, side by side, drawn in plan from outside to inside.
Things to count: 0 in 5 units · 0 in 4 units
The usual question
Brick or timber?
It is tempting to compare one product with another: a brick with a timber stud, a figure per tonne with a figure per cubic metre. But nobody builds with a single material. They build walls.
Outside
The outside
The outside of a cavity wall is one product: facing brick, laid in mortar. The outside of a timber-frame wall is four: cladding, battens with an air gap behind, a breather membrane and sheathing board.
Middle
The middle
Behind the brick are a clear cavity, insulation, and steel ties holding the two leaves together. In the timber wall, the studs carry the load and insulation fills the space between them.
Inside
The inside
Inside the cavity wall: blockwork, adhesive dabs and plasterboard. Inside the timber wall: a vapour control layer, a gap for pipes and cables, plasterboard, and the nails, screws and plates that hold the frame together.
The count
Seven things against ten
Each can have its own EPD, in its own unit: per tonne, per square metre, per cubic metre or per kilogram. Before anything can be added up, every quantity has to be converted into its EPD’s unit.
So
The wall is the unit
So which is lower carbon? Comparing a brick with a stud cannot tell you. Only the whole wall can: every layer counted in its own unit, over the same stages, for walls that perform the same.
That is the work of a whole-life carbon assessment, and it is why this site never ranks one material against another.
- 1Facing brickabout 59 per m²tonne, kg or 1,000 bricks
- 2Mortarin the joints of both leavesm³ or tonne
- 3Cavity insulationm² at its thicknessm² at a stated thickness, or m³
- 4Wall tiesabout 2.5 per m²kg or tonne of steel
- 5Block inner leafm² of wallm³, tonne or m²
- 6Adhesive dabskg per m²kg
- 7Plasterboardm² of wallm²
- 1Timber claddingm² of wallm² or m³
- 2Battens (air gap)m³ of timberm³
- 3Breather membranem² of wallm² or kg
- 4Sheathing boardm² of wallm² or m³
- 5Timber studsm³ of timber, studs at 600 mm centresm³
- 6Insulation between studsm² at its thicknessm² at a stated thickness, or m³
- 7Vapour control layerm² of wallm² or kg
- 8Battens (service gap)m³ of timberm³
- 9Plasterboardm² of wallm²
- 10Nails, screws and plateskg per m²kg or tonne of steel
Things to count
0
in 5 units: tonne, kg, 1,000 bricks, m³, m²
Things to count
0
in 4 units: m², m³, kg, tonne
Typical build-ups drawn in plan, not designs. Real thicknesses depend on the performance each wall must meet.
Every material
Every material with an EPD has its own version of this story.
Any product whose EPD reports its stages separately gets the same story on its own page, with a downloadable data sheet that lists its sources.
Browse materialsSources and further reading
- EN 15804:2012+A2:2019, Sustainability of construction works: Environmental product declarations, core rules for the product category of construction products. CEN.
- ISO 14025:2006, Environmental labels and declarations: Type III environmental declarations.
- RICS, Whole life carbon assessment for the built environment, professional standard, 2nd edition, in force from July 2024.
- Approved Document C, Site preparation and resistance to contaminants and moisture, for damp-proof courses and cavity trays.
- UK Net Zero Carbon Buildings Standard , Version 1, 2026: whole-building limits for upfront carbon; product EPDs are evidence towards them.
- Ibstock Atlas Smooth Blue: HUB-1066 Read the EPD
- KLH® CLT: EPD-IES-0027209:001 Read the EPD