Cob

Subsoil, straw and water trodden into a stiff mix and raised in lifts without formwork. Thick, monolithic, sculptural walls with high thermal mass.

Cob

Carbon and evidence

How This Is Made

An Environmental Product Declaration is issued by a manufacturer against a declared unit. This record has neither, so it states sourced facts about process and provenance instead of a carbon figure.

No published figure held

Devon and the South West; a large stock of listed cob buildings remains in use

Process

Feedstock

Earth

Site-won subsoil with a straw binder; never topsoil

Process heat

No heat

Binder

Clay

Fabrication

Site-formed

Sourcing: site-won

Who Builds It

Specialist trade

Rare in the UK

Slow: each lift must dry before the next. The programme, not the cost, is usually what kills it

End Of Life

Compostable

Unstabilised cob returns to subsoil; nothing to separate or landfill

Maintenance: Repaired with fresh cob or earth mortar; must be finished vapour-open

Specification Risk

What a specifier has to resolve before this can be built.

Certification
No Agrément; specified by test and precedent, structural engineer sign-off needed
Fire
Non-combustible mass, but the straw content means no Euroclass classification is held
Warranty
Workmanship only
Insurance
Warranty providers may not accept it — check NHBC or an alternative provider early
Supply
Very few UK contractors. Secure the trade before committing the design.

Read This Honestly

  • Not rammed earth. No formwork, no compaction, no cement — different material, different figures.
  • A cement render or an impermeable paint will trap moisture and cause structural failure.

Design & Specification Notes

Subsoil, straw and water trodden into a stiff mix and raised in lifts without formwork.

Material Note

Unfired subsoil raised by hand, so the material carries almost no process energy — the impact is in the labour and the roof and plinth that keep it dry. It is not rammed earth: no formwork, no compaction, and no stabiliser.

Typical Uses

  • Primary frame
  • Long-span elements
  • Load-bearing supports

Key Performance

High load-bearing capacity for primary frame.

Specification Actions

  • Confirm the subsoil is site-won and its clay content tested — cob is mixed to the soil, not to a recipe.
  • Detail a generous roof overhang and a masonry plinth; cob fails from water, not from load.
  • Specify a lime render or limewash finish. A cement render will trap moisture and destroy the wall.

Indicative Health & Indoor Air

low Risk

Unfired subsoil and straw. Vapour-open; must stay vapour-open to remain sound.

Evidence:Reference data — process facts

Products in this category

6 products from 4 manufacturers · 354 in this category. Ordered by the evidence each record holds, never by commercial standing.

Specification

Finish
Monolithic cob, lime-rendered
Service life
100 years